Skip to content

Updates NIBP measurement finalization, MAP tracking, and runtime reset handling

Nileshkumar Solanki requested to merge nilesh-dev into master
  • Fix baseline voltage validation and configuration assignment
  • Add PR averaging re-initialization during abort/reset flows
  • Modified MAP pulse tracking using configurable pulse tracking modes
  • Add support for LIVE, POSITIVE_PEAK, and PEAK_TO_PEAK tracking
  • Improve MAP storage logic after diastolic detection
  • Add fast measurement completion feature option
  • Support early measurement completion using parameter status or deflation limit
  • Improve finalize measurement flow readability using is_measured flag
  • Add invalid pulse tracking mode warning handling
  • Remove unnecessary peak detection structure reset
  • Improve runtime reinitialization stability after measurement restart

Merge request reports

Loading